|
Report expires: 15/09/2026 |
| Last Updated | Date of report | Report number |
|---|---|---|
| Sept 15, 2025 | Sept 15, 2025 | 02-isis-recovery-totalkare-column-lifts-mc75n-4b-ls-s-n-032308-1-2-3-4 |
| Name and address of employer | Address of the premesis | ||||||
|---|---|---|---|---|---|---|---|
| ISIS Recovery Banbury OX17 2JH | ISIS Recovery Banbury OX17 2JH |
| Description of the equipment | Safe working load | Date of exam | Date of manufacture | Date of last examination |
|---|---|---|---|---|
| 02 Totalkare Column lifts MC75N-4B-LS s/n 032308/1 032308/2. 032308/3. 032308/4 | Max 7500kg per column | Sept 15, 2025 | 2022 | Unknown |
| Defects None |
||||
| Is this the first examination after installation? | Has the equipment been installed correctly? |
|---|---|
| no | yes |
| Was the examination carried out? | In accordance of the examination scheme? | In exceptional circumstances? |
|---|---|---|
| In an interval of 12 months | yes | no |
| Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect: |
|---|
No defects |
| Particulars of any test carried out as part of the examination? |
|---|
Full test carried out |
| Is the above a defect which is immediate danger to persons | no |
|---|---|
| Is the above a defect which is not yet but could become an immediate danger to persons | no |
| Is this equipment safe to operate? | Yes |
|---|
| Name of person authenticating this report: | Andrew Sands BAGMA Approved Thorough Examiner BAGMA ID: 210011893 The Loler Man - NN15 6TP |
|---|