Report expires:   07/06/2025  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Dec 07, 2024 Dec 07, 2024 2576-bennie-equipment-terberg-kinglifter-s-n-tk21247585

Client details

   Name and address of employer           Address of the premesis      
Bennie equipment Cranford road Kettering NN15 5TB For farmers ltd Dwan mill walton summit PR5 8AH

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
TKL-M 3X3 3200 Terberg kinglifter s/n TKL21247585 As per manufacturer's instructions Dec 07, 2024 2024 Declaration of conformity
Defects
See below

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 6 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

Loading securing split pin on righthand side needs replacing.


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
The Loler Man - NN15 6TP