|
Report expires:
19/02/2025
|
Report of thorough examination of lifting equipment
This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998
Last Updated |
Date of report |
Report number |
Jul 22, 2021 |
Jul 22, 2021 |
3w5y2z2s |
Client details
Name and address of employer | Address of the premesis |
Another Oli | Another Oli |
Equipment / Examination
Description of the equipment |
Safe working load |
Date of exam |
testing 123 |
|
Feb 19, 2025 |
N/A N/A
N/A |
Is this the first examination after installation? |
Has the equipment been installed correctly? |
yes |
yes |
Was the examination carried out? |
In accordance of the examination scheme? |
In exceptional circumstances? |
In an interval of 6 months |
yes |
yes |
Particulars of any test carried out as part of the examination? |
NONE |
Is the above a defect which is immediate danger to persons |
yes |
Is the above a defect which is not yet but could become an immediate danger to persons |
yes |
Is this equipment safe to operate? |
Yes |
Name of person authenticating this report: |
Andrew Sands
The Loler Man - NN15 6TP |