|
Report expires: 12/03/2027 |
| Last Updated | Date of report | Report number |
|---|---|---|
| Mar 12, 2026 | Mar 12, 2026 | cpr-252-contract-plant-rental-doosan-loading-shovel-s-n-dwgcwleclm1010123 |
| Name and address of employer | Address of the premesis | ||||||
|---|---|---|---|---|---|---|---|
| Contract plant rental Wellingborough NN8 4RJ | Global Ardour Recycling ltd Longridge road Preston PR2 5BX |
| Description of the equipment | Safe working load | Date of exam | Date of manufacture | Date of last examination |
|---|---|---|---|---|
| DL420-7 Doosan Loading shovel s/n DWGCWLECLM1010123 | Max 5.5 cubic yards | Mar 12, 2026 | 2021 | 01-04-2025 |
| Defects No defects |
||||
| Is this the first examination after installation? | Has the equipment been installed correctly? |
|---|---|
| no | yes |
| Was the examination carried out? | In accordance of the examination scheme? | In exceptional circumstances? |
|---|---|---|
| In an interval of 12 months | yes | no |
| Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect: |
|---|
No defects |
| Particulars of any test carried out as part of the examination? |
|---|
Full test carried out |
| Is the above a defect which is immediate danger to persons | no |
|---|---|
| Is the above a defect which is not yet but could become an immediate danger to persons | no |
| Is this equipment safe to operate? | Yes |
|---|
| Name of person authenticating this report: | Andrew Sands BAGMA Approved Thorough Examiner BAGMA ID: 210011893 The Loler Man - NN15 6TP |
|---|