|
Report expires: 11/02/2026 |
| Last Updated | Date of report | Report number |
|---|---|---|
| Aug 11, 2025 | Aug 11, 2025 | cpr-374-liebherr-lh40-material-handler-s-n-150941 |
| Name and address of employer | Address of the premesis | ||||||
|---|---|---|---|---|---|---|---|
| Contract pant rental Erith DA9 2QA | Total waste Basildon SS13 1EB |
| Description of the equipment | Safe working load | Date of exam | Date of manufacture | Date of last examination |
|---|---|---|---|---|
| CPR 374 Liebherr LH40 material handler s/n 150941 | As per manufacturer’s guidelines | Aug 11, 2025 | 2023 | Unknown |
| Defects None |
||||
| Is this the first examination after installation? | Has the equipment been installed correctly? |
|---|---|
| no | yes |
| Was the examination carried out? | In accordance of the examination scheme? | In exceptional circumstances? |
|---|---|---|
| In an interval of 6 months | yes | no |
| Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect: |
|---|
No defects |
| Particulars of any test carried out as part of the examination? |
|---|
Full test carried out |
| Is the above a defect which is immediate danger to persons | no |
|---|---|
| Is the above a defect which is not yet but could become an immediate danger to persons | no |
| Is this equipment safe to operate? | Yes |
|---|
| Name of person authenticating this report: | Andrew Sands BAGMA Approved Thorough Examiner BAGMA ID: 210011893 The Loler Man - NN15 6TP |
|---|