![]() |
Report expires: 24/08/2025 |
Last Updated | Date of report | Report number |
---|---|---|
Feb 24, 2025 | Feb 24, 2025 | cpr-725-atlas-350mh-material-handler-contract-plant-rental-s-n-352m-301657 |
Name and address of employer | Address of the premesis | ||||||
---|---|---|---|---|---|---|---|
Contract plant rental Preston PR5 8AY | Contract plant rental Wellingborough NN8 |
Description of the equipment | Safe working load | Date of exam | Date of manufacture | Date of last examination |
---|---|---|---|---|
CPR 725 Atlas 350MH material handler s/n 352M301657 | As per manufacturer’s guidelines | Feb 24, 2025 | 2023 | Unknown |
Defects None |
Is this the first examination after installation? | Has the equipment been installed correctly? |
---|---|
no | yes |
Was the examination carried out? | In accordance of the examination scheme? | In exceptional circumstances? |
---|---|---|
In an interval of 6 months | yes | no |
Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect: |
---|
No defects |
Particulars of any test carried out as part of the examination? |
---|
Full test carried out |
Is the above a defect which is immediate danger to persons | no |
---|---|
Is the above a defect which is not yet but could become an immediate danger to persons | no |
Is this equipment safe to operate? | Yes |
---|
Name of person authenticating this report: | Andrew Sands The Loler Man - NN15 6TP |
---|