Report expires: 13/11/2025 |
Last Updated | Date of report | Report number |
---|---|---|
Nov 13, 2024 | Nov 13, 2024 | crane-hill-engineering-ltd-power-press-pp6-s-n-18a512 |
Name and address of employer | Address of the premesis | ||||||
---|---|---|---|---|---|---|---|
Crane hill engineering Ltd Harvey reeves road NN5 5JR | Crane hill engineering Ltd Harvey reeves road NN5 5JR |
Description of the equipment | Safe working load | Date of exam | Date of manufacture | Date of last examination |
---|---|---|---|---|
Mechanical power press PP6 Worcester 18C/ - frame inclinabile s/n 18A512 | Max 18 tons none lifting | Nov 13, 2024 | Unknown | Unknown |
Defects See below |
Is this the first examination after installation? | Has the equipment been installed correctly? |
---|---|
no | yes |
Was the examination carried out? | In accordance of the examination scheme? | In exceptional circumstances? |
---|---|---|
In an interval of 6 months | yes | no |
Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect: |
---|
Other defects: Advise bolt press to floor. Operating foot pedal to be shrouded to prevent accidental operation. Secure all front lower rising guard bars and ensure that guard frame sides are securely and correctly spaced ae missing cross bar replaced. Observations: Play in Pitman Ball: 0.2mm, Play in Pitman Screw: 0:0mm, Play in Stroke Bearing: 0.8mm, Note: Front rising guard cross bars cut away to accommodate product feed - ensure that full width bars are replaced when not in use. |
Particulars of any test carried out as part of the examination? |
---|
Full test carried out to PUWER regulations |
Is the above a defect which is immediate danger to persons | no |
---|---|
Is the above a defect which is not yet but could become an immediate danger to persons | no |
Is this equipment safe to operate? | Yes |
---|
Name of person authenticating this report: | Andrew Sands The Loler Man - NN15 6TP |
---|