Report expires:   13/11/2025  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Nov 13, 2024 Nov 13, 2024 crane-hill-engineering-power-press-pp1-s-n-g8-844

Client details

   Name and address of employer           Address of the premesis      
Crane hill engineering Ltd Harvey reeves road NN5 5JR Crane hill engineering Ltd Harvey reeves road NN5 5JR

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
Mechanical power press (geared) PP1 G8 C frame fixed s/n G8-844 Max 80 tons none lifting Nov 13, 2024 Unknown Unknown
Defects
We below

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 6 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

Other defects: Gaps at top of side guards should be enlclosed.

Advise fully bolt press to floor.

Observations: Play in Pitman Ball: 0mm, Play in Pitman Screw: 0mm, Play in Stroke Bearing: 0mm, Clutch key strike face pitted and worn - serviceable (as at dismantle 23/11/18)


Particulars of any test carried out as part of the examination?

Interlocked Front Guard:

Fixed Side Guards

Fixed Rear Guard: Full test carried out to PUWER requirements


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
The Loler Man - NN15 6TP