Report expires:   13/11/2025  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Nov 13, 2024 Nov 13, 2024 crane-hill-engineering-pp3-power-press-s-n-1-6068-1945

Client details

   Name and address of employer           Address of the premesis      
Crane hill engineering Ltd Harvey reeves road NN5 5JR Crane hill engineering Ltd Harvey reeves road NN5 5 JR

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
Mechanical power press PP3 C-frame inclineable s/n 1-6068-1945 Max 12 tons none lifting Nov 13, 2024 1945 Unknown
Defects
See below

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 6 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

Other defects: Gaps at top for front guard should be enclosed

Fit suitable anti-fall back device

Advise bolt press to floor

Observations: Play in Pitman Ball: 0.7mm, Play in Pitman Screw: 0.1mm, Play in Stroke Bearing: 0.1mm, Flywheel and crankshaft scored - serviceable as per last clutch dismantle 23/11/18, Clutch key worn - serviceable as per last clutch dismantle 23/11/18


Particulars of any test carried out as part of the examination?

Front Guard: Automatic

Side Guards: Fixed

Rear Guards: Fixed

Full test carried out to PUWER requirements


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
The Loler Man - NN15 6TP