Report expires:   04/11/2026  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Nov 04, 2024 Nov 04, 2024 dcv-3087-workshop-air-compressor-rednal-pneumatics-s-n-42639-035

Client details

   Name and address of employer           Address of the premesis      
DCV ENGINEERING LTD WELLINGBOROUGH NN8 4BB DCV ENGINEERING LTD WELLINGBOROUGH NN8 4BB

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
DCV 3087 WORKSHOP AIT COMPRESSOR / REDNAL PNEUMATICS S/N 42639/035 PUWER INSPESTION MAX WORKING PRESSURE 12 BAR Nov 04, 2024 2006 UNKNOWN
Defects
NO DEFECTS

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 12 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

NO DEFECTS


Particulars of any test carried out as part of the examination?

THOROUGH VISUAL EXAMINATION AND FUNCTIONAL TEST

The above mentioned equipment are visually and functionally inspected and found safe for its intended use


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
The Loler Man - NN15 6TP