|
Report expires:
22/01/2026
|
Report of thorough examination of lifting equipment
This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998
| Last Updated |
Date of report |
Report number |
| Jul 22, 2025 |
Jul 22, 2025 |
dsb-1001-premier-plant-hire-zoomlion-mobile-boom-lift-s-n-0771100001p000013 |
Client details
| Address of the premesis |
| Premier plant hire Narborough LE192GA |
Equipment / Examination
| Description of the equipment |
Safe working load |
Date of exam |
Date of manufacture | Date of last examination |
| Zoomlion ZA20J mobile boom lift s/n 0771100001P000013 |
454kg |
Jul 22, 2025 |
03-2023 | 16-01-2025
|
Defects
None |
| Is this the first examination after installation? |
Has the equipment been installed correctly? |
| no |
yes |
| Was the examination carried out? |
In accordance of the examination scheme? |
In exceptional circumstances? |
| In an interval of 6 months |
yes |
no |
| Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect: |
No defects |
| Particulars of any test carried out as part of the examination? |
Full test carried out |
| Is the above a defect which is immediate danger to persons |
no |
| Is the above a defect which is not yet but could become an immediate danger to persons |
no |
| Is this equipment safe to operate? |
Yes |
| Name of person authenticating this report: |
Andrew Sands
BAGMA Approved Thorough Examiner
BAGMA ID: 210011893
The Loler Man - NN15 6TP |