![]() |
Report expires: 15/04/2026 |
Last Updated | Date of report | Report number |
---|---|---|
Apr 15, 2025 | Apr 15, 2025 | eagle-plant-wolverhampton-4732-jcb-telehandler-540-170-s-n-jcb5af2ghk2790115 |
Name and address of employer | Address of the premesis | ||||||
---|---|---|---|---|---|---|---|
Eagle plant cross street Wolverhampton WV1 2HS | Stoke city training ground ST4 6NL |
Description of the equipment | Safe working load | Date of exam | Date of manufacture | Date of last examination |
---|---|---|---|---|
JCB telehandler 540-170 s/n JCB5AF2GHK2790115 | Max 4000kg | Apr 15, 2025 | 2019 | 10-05-2023 |
Defects None |
Is this the first examination after installation? | Has the equipment been installed correctly? |
---|---|
no | yes |
Was the examination carried out? | In accordance of the examination scheme? | In exceptional circumstances? |
---|---|---|
In an interval of 12 months | yes | no |
Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect: |
---|
No defects |
Particulars of any test carried out as part of the examination? |
---|
Full test carried out |
Is the above a defect which is immediate danger to persons | no |
---|---|
Is the above a defect which is not yet but could become an immediate danger to persons | no |
Is this equipment safe to operate? | Yes |
---|
Name of person authenticating this report: | Andrew Sands The Loler Man - NN15 6TP |
---|