Report expires:   03/02/2027  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Feb 03, 2026 Feb 03, 2026 f11-1001-premier-plant-and-tool-merlo-p34-11-s-n-02715-reg-fj22btx

Client details

      Address of the premesis      
Premier Plant Hire, Narborough, LE19 2GA. Winvic, Watling Street, LE10 3ED

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
F11-1001 Merlo P35.11 Telehandler s/n ZF1P50TE8D2002715 Reg FJ22 BTX Max 3500kg Feb 03, 2026 2022 06/02/2025
Defects
None

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 12 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

No defects


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
BAGMA Approved Thorough Examiner
BAGMA ID: 210011893
The Loler Man - NN15 6TP