Report expires:   29/01/2025  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Jan 29, 2024 Jan 29, 2024 f11-1002-premier-plant-and-tool-jcb-535-125-s-n-27727-reg-sh18-xdt

Client details

      Address of the premesis      
Premier plant and tool Wigston Leicester LE18 4TP

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
F11-1002 JCB 535-125 s/n 27727 Reg SH18 XDT Max 3500kg Jan 29, 2024 2018 Unknown
Defects
None

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 12 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

No defects


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
The Loler Man - NN15 6TP