|
Report expires:
26/01/2025
|
Report of thorough examination of lifting equipment
This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998
Last Updated |
Date of report |
Report number |
Jan 26, 2024 |
Jan 26, 2024 |
f14-1008-preimer-plant-jcb-telehandler-540-140-s-n-9165 |
Client details
Address of the premesis |
Premier plant and tool hire Wigston LE18 4TP |
Equipment / Examination
Description of the equipment |
Safe working load |
Date of exam |
Date of manufacture | Date of last examination |
F14-1008 JCB Telehandler 540-140 s/n 3009165 |
Max 4000kg |
Jan 26, 2024 |
2021 | Unknown
|
Defects
None |
Is this the first examination after installation? |
Has the equipment been installed correctly? |
no |
yes |
Was the examination carried out? |
In accordance of the examination scheme? |
In exceptional circumstances? |
In an interval of 12 months |
yes |
no |
Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect: |
No defects |
Particulars of any test carried out as part of the examination? |
Full test carried out |
Is the above a defect which is immediate danger to persons |
no |
Is the above a defect which is not yet but could become an immediate danger to persons |
no |
Is this equipment safe to operate? |
Yes |
Name of person authenticating this report: |
Andrew Sands
The Loler Man - NN15 6TP |