|
Report expires:
07/06/2025
|
Report of thorough examination of lifting equipment
This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998
Last Updated |
Date of report |
Report number |
Jun 07, 2024 |
Jun 07, 2024 |
f14-1009-jcb-telehandler-540-140-sg21-fzz |
Client details
Address of the premesis |
PREIMER PLANT AND TOOL HIRE LE19 2GA |
Equipment / Examination
Description of the equipment |
Safe working load |
Date of exam |
Date of manufacture | Date of last examination |
F14-1009 JCB TELEHANDLER 540-140 SG21FZZ |
MAX 4000KG |
Jun 07, 2024 |
2021 | UNKNOWN
|
Defects
NONE |
Is this the first examination after installation? |
Has the equipment been installed correctly? |
no |
yes |
Was the examination carried out? |
In accordance of the examination scheme? |
In exceptional circumstances? |
In an interval of 12 months |
yes |
no |
Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect: |
NO DEFECTS |
Particulars of any test carried out as part of the examination? |
FULL TEST CARRIED OUT |
Is the above a defect which is immediate danger to persons |
no |
Is the above a defect which is not yet but could become an immediate danger to persons |
no |
Is this equipment safe to operate? |
Yes |
Name of person authenticating this report: |
Andrew Sands
The Loler Man - NN15 6TP |