|
Report expires:
03/01/2026
|
Report of thorough examination of lifting equipment
This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998
| Last Updated |
Date of report |
Report number |
| Jan 03, 2025 |
Jan 03, 2025 |
f7-1003-premier-plant-jcb-telehandler-531-70-s-n-3061558-2 |
Client details
| Address of the premesis |
| Premier plant and tool Narborough LE19 |
Equipment / Examination
| Description of the equipment |
Safe working load |
Date of exam |
Date of manufacture | Date of last examination |
| F7-1003 JCB Telehandler 531-70 s/n 3061558 |
Max 3100kg |
Jan 03, 2025 |
2021 | Unknown
|
Defects
None |
| Is this the first examination after installation? |
Has the equipment been installed correctly? |
| no |
yes |
| Was the examination carried out? |
In accordance of the examination scheme? |
In exceptional circumstances? |
| In an interval of 12 months |
yes |
no |
| Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect: |
No defects |
| Particulars of any test carried out as part of the examination? |
Full test carried out |
| Is the above a defect which is immediate danger to persons |
no |
| Is the above a defect which is not yet but could become an immediate danger to persons |
no |
| Is this equipment safe to operate? |
Yes |
| Name of person authenticating this report: |
Andrew Sands
BAGMA Approved Thorough Examiner
BAGMA ID: 210011893
The Loler Man - NN15 6TP |