Report expires:   07/11/2026  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Nov 07, 2025 Nov 07, 2025 f9-1006-premier-plant-hire-jcb-9m-telehandler-reg-mk73-xxj

Client details

      Address of the premesis      
Premier plant hire Narborough LE19 2GA. Symmetry Park, NN14 1FQ

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
F9-1006 JCB 535-95 Telehandler s/n JCB5ABMGKR3317431 Reg MK73 XXJ Max 3500kg Nov 07, 2025 2024 Declaration of conformity
Defects
None

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 12 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

No defects


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
BAGMA Approved Thorough Examiner
BAGMA ID: 210011893
The Loler Man - NN15 6TP