|
Report expires:
11/11/2024
|
Report of thorough examination of lifting equipment
This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998
Last Updated |
Date of report |
Report number |
Jul 20, 2021 |
Jul 20, 2021 |
jw5vipgz |
Client details
Name and address of employer | Address of the premesis |
Scanlans | 125 133 Pollard |
Equipment / Examination
Is this the first examination after installation? |
Has the equipment been installed correctly? |
yes |
yes |
Was the examination carried out? |
In accordance of the examination scheme? |
In exceptional circumstances? |
In an interval of 6 months |
yes |
yes |
Particulars of any test carried out as part of the examination? |
11 |
Is the above a defect which is immediate danger to persons |
yes |
Is the above a defect which is not yet but could become an immediate danger to persons |
yes |
Is this equipment safe to operate? |
Yes |
Name of person authenticating this report: |
Andrew Sands
The Loler Man - NN15 6TP |