Report expires:   17/04/2025  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Apr 17, 2024 Apr 17, 2024 k1-bpl-bennie-equipment-hiab-422ep-3xs

Client details

   Name and address of employer           Address of the premesis      
Bennie equipment Ltd cranford road Burton Latimer NN15 5TB Bennie equipment Ltd Ceanford road Burton Latimer NN15 5TB

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
K1 BPL Hiab crane 422EP-3XS s/n 4220888 Max 12000kg@ 3.2 meters Apr 17, 2024 2008 Unknown
Defects
None

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 12 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

No defects


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
The Loler Man - NN15 6TP