Report expires:   30/10/2024  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Oct 30, 2023 Oct 30, 2023 l180h-wheeled-loading-shovel-paul-chapman-and-sons-s-n-5209

Client details

   Name and address of employer           Address of the premesis      
Paul chapman and sons pisani works Derby road Cromford DE4 5HN Cliffe Hill quarry Coalville LE67 9TJ

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
Volvo L180H wheeled loading shovel s/n VCEL180HC00005209 Max 4.6m3 with a 3.2 meter bucket Oct 30, 2023 2018 26-09-2022
Defects
None

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 12 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

No defects


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons yes
Is the above a defect which is not yet but could become an immediate danger to persons yes
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
The Loler Man - NN15 6TP