Report expires: 25/09/2024 |
Last Updated | Date of report | Report number |
---|---|---|
Mar 25, 2024 | Mar 25, 2024 | natural-waste-water-sloutions-32-mm-manhole-pipe-lifting-pins-s-n-mlp78953u-mlp78954u |
Name and address of employer | Address of the premesis | ||||||
---|---|---|---|---|---|---|---|
Natural waste water sloutions coventry CV4 7EZ | Cirencester water treatment works south cerney |
Description of the equipment | Safe working load | Date of exam | Date of manufacture | Date of last examination |
---|---|---|---|---|
32 MM MANHOLE PIPE LIFTING PINS X3 S/N MLP78962U. MLP78965U. MLP78960U | MAX SWL 1000kg @ 45' P/PIN | Mar 25, 2024 | 2022 | unknown |
Defects none |
Is this the first examination after installation? | Has the equipment been installed correctly? |
---|---|
no | yes |
Was the examination carried out? | In accordance of the examination scheme? | In exceptional circumstances? |
---|---|---|
In an interval of 6 months | yes | no |
Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect: |
---|
no defects |
Particulars of any test carried out as part of the examination? |
---|
full test carried out |
Is the above a defect which is immediate danger to persons | no |
---|---|
Is the above a defect which is not yet but could become an immediate danger to persons | no |
Is this equipment safe to operate? | Yes |
---|
Name of person authenticating this report: | Andrew Sands The Loler Man - NN15 6TP |
---|