Report expires:   24/10/2025  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Oct 24, 2024 Oct 24, 2024 paul-chapman-and-sons-komatsu-loading-shovel-wa480-s-n-h53190

Client details

   Name and address of employer           Address of the premesis      
Paul chapman and sons Ltd Matlock DE4 5HN Astwood dale quarry Buxton SK179TB

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
Komatsu loading shovel WA480 s/n H53190 Max 5.3m3 bucket Oct 24, 2024 2020 30-10-23
Defects
None

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 12 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

No defects


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
The Loler Man - NN15 6TP