Report expires:   24/01/2026  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Jan 24, 2025 Jan 24, 2025 pioneer-plant-dl80tl-s-n-xp5d5a1t8nt034974

Client details

   Name and address of employer           Address of the premesis      
Pioneer plant 13 Brunel Road Corby NN17 4JW Pioneer plant 13 Brunel Road Corby NN17 4JW

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
Doosan DL80TL s/n XP5D5A1T8NT034974 with fork attachment PV-2A-1200-Z-L30 As per manufacturer’s guidelines Jan 24, 2025 Both 2022 Unknown
Defects
None

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 12 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

No defects


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
The Loler Man - NN15 6TP