Report expires:   31/03/2027  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Mar 31, 2026 Mar 31, 2026 pioneer-plant-jcb-457-s-n-2672627

Client details

   Name and address of employer           Address of the premesis      
Pioneer Plant, Corby, NN17 4JW Encyclis Ltd, Green Lane, Bedford, MK43 9LY

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
JCB 457 Wheeled Loader s/n JCB4A0ACCM2672627 As per manufacturer’s specifications Mar 31, 2026 Not marked Unknown
Defects
None

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 12 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

No defects


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
BAGMA Approved Thorough Examiner
BAGMA ID: 210011893
The Loler Man - NN15 6TP