Report expires:   09/06/2027  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Jun 09, 2026 Jun 09, 2026 r5462-eagle-plant-london-west-jcb-531-70-telehandler-s-n-2789819-reg-wp19-wux

Client details

   Name and address of employer           Address of the premesis      
Eagle Plant London West, Stanwell Moor, TW19 6AQ Homers Farm, Staines Road, TW14 8RU

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
R5462 JCB 531-70 Telehandler s/n JCB5AA2GVK2789819 Reg WP19 WUX Max 3100kg Jun 09, 2026 2019 Unknown
Defects
None

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 12 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

No defects


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
BAGMA Approved Thorough Examiner
BAGMA ID: 210011893
The Loler Man - NN15 6TP