|
Report expires:
19/05/2024
|
Report of thorough examination of lifting equipment
This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998
Last Updated |
Date of report |
Report number |
May 19, 2023 |
May 19, 2023 |
recycling-lives-northampton-doosan-forklift-d50c-9-s-n-fdb44-5110-00036-2 |
Client details
Address of the premesis |
Recycling lives Northampton Tweed road NN5 5AJ |
Equipment / Examination
Description of the equipment |
Safe working load |
Date of exam |
Date of manufacture |
Doosan forklift D50C-9 s/n FDB44-5110-00036 |
Max 5000kg |
May 19, 2023 |
2021 N/A |
Defects
No defects |
Is this the first examination after installation? |
Has the equipment been installed correctly? |
no |
yes |
Was the examination carried out? |
In accordance of the examination scheme? |
In exceptional circumstances? |
In an interval of 12 months |
yes |
no |
Particulars of any test carried out as part of the examination? |
Full test carried out |
Is the above a defect which is immediate danger to persons |
no |
Is the above a defect which is not yet but could become an immediate danger to persons |
no |
Is this equipment safe to operate? |
Yes |
Name of person authenticating this report: |
Andrew Sands
The Loler Man - NN15 6TP |