Report expires:   24/12/2024  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Jun 24, 2024 Jun 24, 2024 think3e-loading-ramp

Client details

   Name and address of employer           Address of the premesis      
Think3e consortium Wellingborough NN8 3EY Think3e consortium Wellingborough NN9 3EY

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
Chase 10 ton loading ramp 10000kg Jun 24, 2024 Unknown Unknown
Defects
None

Is this the first examination after installation? Has the equipment been installed correctly?
yes yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 6 months yes yes

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

No defects


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons yes
Is the above a defect which is not yet but could become an immediate danger to persons yes
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
The Loler Man - NN15 6TP