Report expires:   03/02/2027  

Report of thorough examination of lifting equipment

This report complies with the requirements of the Lifting Operations and Lifting Equipment Regulations 1998


    Last Updated       Date of report         Report number    
Feb 03, 2026 Feb 03, 2026 trl-mx69-eke-recovery-truck-twin-deck-body-gromex

Client details

   Name and address of employer           Address of the premesis      
TRL transport 69 Rixon Road Wellingborough NN8 4BA TRL transport 69 Rixon Road Wellingborough NN8 4BA

Equipment / Examination

Description of the equipment Safe working load Date of exam Date of manufacture Date of last examination
MX69 EKE Growmex twin deck car transporter and winch As per manufacturer’s guidelines top deck 1200kg bottom deck 2000kg Feb 03, 2026 2020 Declaration of conformity
Defects
None

Is this the first examination after installation? Has the equipment been installed correctly?
no yes

Was the examination carried out? In accordance of the examination scheme? In exceptional circumstances?
In an interval of 12 months yes no

Identification of any part found to have a defect which is or could become a danger to persons and a description of this defect:

No defects


Particulars of any test carried out as part of the examination?

Full test carried out


Is the above a defect which is immediate danger to persons no
Is the above a defect which is not yet but could become an immediate danger to persons no
Is this equipment safe to operate? Yes

Name of person authenticating this report: Andrew Sands
BAGMA Approved Thorough Examiner
BAGMA ID: 210011893
The Loler Man - NN15 6TP